project
GONE Hemmingstätterweg
Parallel charging of cars during working hours
Flexible expansion from 12 to 30 charging stations possible
Ä¢¹½ÊÓƵÎÛ's innovative technology made it possible to use the existing power connection to charge multiple electric cars. As a result, costly measures, such as installing a second house connection or building a transformer house, could be avoided. In addition, aspects of fire protection and liability risks for insurance claims played an important role in the planning phase.
12
Aqueduct charging stations